
Carlos installs valley rafter
The valley rafters in this frame were the most complicated to layout and cut, all four fit well.
Filed under Uncategorized
Ash pegs are driven
The pegs secure the tenon on the curved braces to the mortise in the 10 x 10 post. Ben uses another peg as a giant “nail set”.
Filed under Uncategorized
Crux timbers curve to create the classic Gothic Arch
The greatroom has three pairs of crux braces that mimic the crux frames in the old english tithe barns.
Filed under Uncategorized
Some of the last purlins go in place
The purlins half-lap over the rafters and are fastened in place.
Filed under Uncategorized
Carlos and Ethan carry connecting timbers onto the deck before raising
The bents are laid on the decking ready to be raised by a crane. 
Filed under Uncategorized




